Notifications



The following prevailing wage rates were updated, changed or added. Click on the labor code to view the prevailing wages for that county or region.

Tip Get notified when this page changes. Click here to sign up by e-mail.



Commercial

County Labor code and class Revised date
(yyyy-mm-dd)
ANOKA 720 ROOFER 2026-02-09
CARVER 720 ROOFER 2026-02-09
CHISAGO 720 ROOFER 2026-02-09
DAKOTA 720 ROOFER 2026-02-09
GOODHUE 720 ROOFER 2026-02-09
HENNEPIN 720 ROOFER 2026-02-09
ISANTI 720 ROOFER 2026-02-09
LAC QUI PARLE 707 ELECTRICIANS 2026-02-02
LESUEUR 110 SURVEY FIELD TECHNICIAN (OPERATE TOTAL STATION, GPS RECEIVER, LEVEL, ROD OR RANGE POLES, STEEL TAPE MEASUREMENT; MARK AND DRIVE STAKES; HAND OR POWER DIGGING FOR AND IDENTIFICATION OF MARKERS OR MONUMENTS; PERFORM AND CHECK CALCULATIONS; REVIEW AND UNDERSTAND CONSTRUCTION PLANS AND LAND SURVEY MATERIALS). THIS CLASSIFICATION DOES NOT APPLY TO THE WORK PERFORMED ON A PREVAILING WAGE PROJECT BY A LAND SURVEYOR WHO IS LICENSED PURSUANT TO MINNESOTA STATUTES, SECTIONS 326.02 TO 326.15. 2026-02-02
MCLEOD 720 ROOFER 2026-02-09
RAMSEY 720 ROOFER 2026-02-09
SCOTT 720 ROOFER 2026-02-09
SIBLEY 720 ROOFER 2026-02-09
WASHINGTON 720 ROOFER 2026-02-09
WRIGHT 720 ROOFER 2026-02-09
YELLOW MEDICINE 717 PIPEFITTERS . STEAMFITTERS 2026-02-02


Highway and heavy

Region Labor code and class Revised date
(yyyy-mm-dd)
01 203 LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS 2025-12-01
04 715 PAINTERS (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) 2025-12-01
05 728 WIRING SYSTEMS INSTALLER 2025-12-01
06 203 LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS 2025-12-01
  715 PAINTERS (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) 2025-12-01
07 715 PAINTERS (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) 2025-12-01
09 203 LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS 2025-12-01
10 715 PAINTERS (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) 2025-12-01

Prevailing wage | Notifications | Commercial | Highway and heavy